Viewing a single comment thread. View all comments

steventual OP t1_iwe5qny wrote

Thanks! I am doing a few other places in the house, they all have an existing t molding and will need a reducer, what would be the proper way to do it next time? Should I overhang the Lvt tile over the edge to cover the gap? I was worried that it wouldn’t have support under it and may crack on stepping. Or should I do the same thing, leave the gap and glue to the top Lvt?

1

NotWorthTheTimeX t1_iwe766s wrote

It all depends on what flooring type you’re transitioning to. Assuming they’re all LVT to wood like this, you’re doing it correctly.

Never overhang the LVT over the edge to cover the gap. It needs to be fully supported.

1