Viewing a single comment thread. View all comments

TenPoundSledge t1_j2bd4st wrote

Try using the carpet jig that came with the stop squeak screws instead of the bare floor jig. The screws need to pull the sub-floor tight to the joist. If you use the bare floor jig they are pulling on the flooring and will be less effective. Start just outside the squeak zone and put a screw in every three or four inches along the joist. Good luck.

2