Submitted by bigjamg t3_zb60h6 in DIY

I used a stud finder to narrow down the center of the 2x4’s which I’m very confident of. Both studs produced sawdust when drilling the pilot holes but the left stud didn’t offer too much resistance when drilling or screwing the lag bolts. The right stud on the other hand was tough to drill and tough to screw the lag bolts into. Should I be worried or what could be causing this? The tv mount is rated for 132 lbs. House was built in 2000.

2

Comments

You must log in or register to comment.

There's nothing here…