Viewing a single comment thread. View all comments

CDSEChris OP t1_j6edzex wrote

Thanks! That's pretty much what I was thinking but wasn't sure about the piece that hung over the beam. So I should cut along the length of the beams and run the 2x4 along the entirety?

1