Surur t1_j46jtss wrote
Reply to comment by project_apex in Iberia's first wind-solar power plant starts operation by darth_nadoma
Per year it appears.
> The solar plant provides an installed capacity of 8.4MW with over 17,000 bifacial solar panels capable of capturing solar irradiance on both sides, maximising energy production.
> The wind park has eight turbines and a total installed capacity of 11MW, including a more powerful machine installed as part of an over-equipment project.
> The hybrid project is capable of producing up to 39.5GWh per year, enough to provide over 30,000 people with renewable energy. The hybrid complex will also help prevent the emission of approximately 18,000 tonnes of CO2 annually.
project_apex t1_j46kccj wrote
Yeah, I figured they messed up Gigawatt and Gigawatthours.
I guess when you say 11MW or 11000kW it just doesn't sound as impressive. I'm pretty sure we now have single wind turbines here in the Netherlands that are rated at more than 11MW.