Comments
RKO36 t1_j93haf4 wrote
They're not replacing it, I don't believe. They're making repairs here and there from my understanding. It isn't closed all the time. I think just from 11-3 some days (Thursday only?)
RKO36 t1_j93k236 wrote
Well, I'll be darned. I knew there was a contract to do repairs on that one and Bridge St and I think one more. I wasn't aware they're looking to replace it.
But lately I can see that bridge from work and the closures have been temporary.
Nexis4Jersey t1_j93lai7 wrote
Its being replaced , I believe the Passaic River NJT Bridge and the Bridge Street Bridge are next followed by the DOCK and FRB Bridge which will be rehabbed.
GhostOfRobertTreat t1_j93sfe7 wrote
Hope they’re taking into account a connection for the future riverfront walkway when they build it….
ScrollHectic t1_j9kr19l wrote
Hopefully it also looks good. A bridge doesn't have to be utilitarian.
1Pichi t1_j93h11d wrote
They’re going to replace it