1Pichi t1_j93h11d wrote

They’re going to replace it

6

RKO36 t1_j93haf4 wrote

They're not replacing it, I don't believe. They're making repairs here and there from my understanding. It isn't closed all the time. I think just from 11-3 some days (Thursday only?)

7

RKO36 t1_j93k236 wrote

Well, I'll be darned. I knew there was a contract to do repairs on that one and Bridge St and I think one more. I wasn't aware they're looking to replace it.

But lately I can see that bridge from work and the closures have been temporary.

3

Nexis4Jersey t1_j93lai7 wrote

Its being replaced , I believe the Passaic River NJT Bridge and the Bridge Street Bridge are next followed by the DOCK and FRB Bridge which will be rehabbed.