Submitted by waynesmith22 t3_11fm3nj in Newark
Polo1985 t1_jalvt6c wrote
Reply to comment by Nexis4Jersey in $4.6M In Air Conditioning Upgrades Coming For Newark Penn Station by waynesmith22
Exactly 150,000 people and the doors don’t work. From what I’ve notice people wait mostly on the platforms. No one really waits around the station, not even on game nights. How are those doors not a hazard?, some are locked or blocked by people. It safer to get people in and out with the proper entrances and exits.
Nexis4Jersey t1_jalzjpz wrote
Installing Automatic doors would be nice, but so would installing turnstiles at least up to the platform areas.
Polo1985 t1_jamd3d3 wrote
I notice how long the platforms are I might be wrong but tracks 2 and 5 seem to be longer than the middle 3 and 4. More entrances and waiting areas that are properly ventilated along those might work. But let’s face it we got them new silver doors lol that’s their improvement
Nexis4Jersey t1_jamehhb wrote
The Long term goal is to restore the southern portion of the station, which would allow for 2 full length trains to occupy each track. Only track 5 can fully handle that at the moment. The Southern portion will also be connected to Prudential via a New Bridge and Station head house.
Viewing a single comment thread. View all comments