Viewing a single comment thread. View all comments

Kalebxtentacion t1_itxn83u wrote

So to clear the air and because this project is at the top of my list I did a lot of research on it. So technically the first two towers should be the ones to get built since they were approved first. The original design was only to towers. When the design changed they also added the third tower and later got the third tower approved. So they decided to build the third tower first along with tower 1 and 2 parking podiums. Right now tower 3 is under construction, tower 1 and 2 are likely to break ground between 2025 or 2027. When they do break ground both towers will be built at the same time instead of one by one. I am guessing since they are the tallest they would need more than the 90 million dollar loan for the third tower. So the first two towers are already approved and can be built at anytime but for right now tower 3 will be the only one. Treat this project as the journal square towers and how each got built at different times etc etc. Towers 1 and 2 will exist in our skyline before 2030, letโ€™s just hope their cousin on broad street can get approved and exist too. Also whoever picked none of the towers will get built is crazy ๐Ÿ˜‚

8