Viewing a single comment thread. View all comments

Affectionate-Buy2539 t1_j8x7hob wrote

In theory, it should move pretty fast if the floor is in and drywall is up because plumbing /electrical beneath all that arguably takes the longest while everything on top (shelves, signage) are the final steps.

Lol a girl can dream!

8