Comments

You must log in or register to comment.

GND52 OP t1_jckfysa wrote

The New York Times writes:

> The estimated $500 million in capital spending would also go toward creating dedicated bus lanes along 31st Street and 19th Avenue in Queens and making the Astoria-Ditmars Blvd. station on the N and W lines accessible to people with disabilities, the Port Authority said. Some of that money could also be spent to create a mile-long lane exclusive to buses on the northbound Brooklyn-Queens Expressway between Northern Boulevard and Astoria Boulevard, the Port Authority said.

Alon responds:

> To be very clear, it does not cost $500 million to make a station wheelchair-accessible. In New York, the average cost is around $70 million in 2021 dollars, with extensive contingency, planned by people who’d rather promise 70 and deliver 65 than promise 10 and deliver 12. In Madrid, the cost is around 10 million euros per station, with four elevators (the required minimum is three), and in Milan, shallow three-elevator station retrofits are around 2 million per station. Transfer stations cost more, proportionately to the number of lines served, but Astoria-Ditmars is not a transfer station and has no such excuse. So where is the other $430 million going?

> The answer cannot just be bus lanes on 31st Street (on which the Astoria Line runs) or 19th Avenue (the industrial road the indicated extension on the map would run on). Bus lanes do not cost $430 million at this scale. They don’t normally cost anything – red paint and “bus only” markings are a rounding error, and bus shelter is $80,000 per stop with Californian cost control (to put things in perspective, I heard a $10,000-15,000 quote, in 2020 dollars, from a smaller American city).

And on the exhorbitant estimates used to dismiss a subway line extension:

> The panel realized that the best option is an extension of the subway. Such an extension would be about 4.7 km long and around one third underground, or potentially around 5 km and entirely above-ground if for some reason tunneling under airport grounds were cost-prohibitive. This does not cost $7 billion, not even in New York. We know this, because Second Avenue Subway phase 1 was, in today’s money, around $2.2 billion per km, and phase 2 is perhaps a little more. There are standard subway : elevated cost ratios out there; the ones that emerge from our database tend to be toward the higher end perhaps, but still consistent with a ratio of about 2.5.

> Overall, this is in theory pretty close to $7 billion for a one-third underground extension from Astoria to the airport. But in practice, the tunneling environment in question is massively easier than both phases of Second Avenue Subway – there’s plenty of space for cut-and-cover boxes in front of the terminal, a more controllable utilities environment, and not much development in the way of the elevated sections, which are mostly in an industrial zone to be redeveloped.

27

HonestPerspective638 t1_jcmjlfn wrote

The subway line will not be extended there. Maybe in 50 to 100 years. It would require massive emminent domain at insane prices for above ground and to cut under a lot of infrastucture underground..

Bus lanes to airports are useless. the BQE is a parking lot in rush hour even if you build a bus lane. the exit ramps are one lane. It would be an isane bottleneck effect and render the bus lanes usless unless you rebuild the BQE

−4

LikesBallsDeep t1_jcnxxca wrote

Wait 500 MILLION dollars for a couple of miles of bus lanes on already existing roads?

What in the flying fuck!?

24

1600hazenstreet t1_jcnydz9 wrote

Welcome to NYC government pricing, where cutting down a tree costs $5k.

12

LikesBallsDeep t1_jcnzumg wrote

I mean yeah.. but 5k vs 500 million.

What's more work, cutting down 100,000 trees? Or painting a couple of miles of existing roads?

10

GND52 OP t1_jcorr6s wrote

  1. It’s an initial estimate that is all but guaranteed to grow
  2. There’s no auditing, so we’re left in the dark as to how exactly that money will be spent.
9

Ed_Hastings t1_jcwtjhv wrote

Good thing our city has a long history of being non-corrupt and efficient with taxpayer money.

3

Fresh720 t1_jcs09hg wrote

Is the city going to outsource the street painting to a contractor? I read the link but I'm still confused how this would cost $500 million

5

IIAOPSW t1_jcuqnpz wrote

Between this and pretending that there's no existing ENY tunnel for IBX, I'm starting to think there's people on the committee intentionally trying to sabotage these projects.

2

Bilbotreasurekeeper t1_jdtn5z2 wrote

Can we please start building affordable housing on artificial islands?

Buying one building and turning it into affordable housing isn't enough. We have to start thinking big. Only way to do that is expand into the Hudson river and outside of queens, Brooklyn and past long island as well. We need to start also building artificial islands out a couple miles too for future use and to stop hurricane waves.

This will also cut down on hurricane waves and flooding

There's no more space in NYC so this is what we need to do.

1