Submitted by keonijared t3_z66hr5 in springfieldMO
Nasaltron t1_iy03jb7 wrote
Pretty sure this is about the huge chunk of bad LED panels, on their brand new $$$$ sign, rather than the language.
keonijared OP t1_iy0d4px wrote
Yes, that's what I was posting this for. Nothing to do with Christmas specifically, haha.
I actually work for a Springfield-local LED manufacturer, and it says a lot for data connection and/or tile/cabinet failure so early after a big installation like this.
sgf-guy t1_iy2gkl1 wrote
I see this sign off my back porch and they did pixel map out a “clean line”. It is a Daktronics board….I’ve seen the generic messages.
Construction has taken forever but is not still done, esp for final edge work on a huge sign. I know nothing about coding but I would assume code clocking certain places on certain pixel lines would be very easy today. And Daktronics, love or hate, is not a small company.
The sign was clean edged code wise with no physical blockage to make a good picture for prob a couple weeks. I always assumed a physical blockage would be needed, but I’m wrong and coding can form an edge.
mcdrunkin t1_iy09njb wrote
Isn't that the door?
Nasaltron t1_iy09vuc wrote
Nah, you can’t tell from the picture but that’s about twenty feet off the ground. Definitely not a door.
Viewing a single comment thread. View all comments