Viewing a single comment thread. View all comments

fond_of_you t1_j4o0ytx wrote

Did you do a frost resistant lab? Or how deep did you dig to pour it?

3

Commercial_Case_7475 t1_j4o1uzy wrote

I did a floating/Alaskan slab. It was about half the price of doing stem walls, maybe even a third of the price (about 10k$). Leveled my gradually sloping site with 7 loads of crushed stone, tamped each layer, the poured a slab on top with tons of rebar.