2leggedturtle t1_itsp9g3 wrote

In general, (1) they didn’t order enough panels (standing seam) to do the job correctly and went and picked up the rest from a different supplier. Tried to tell me “know now would notice” as those were installed in the back. (2) didn’t follow the manufactures instructions. This is true on both the starting panels and the ridge line. I didn’t complain on e the panels as they were doing to job of protecting the sheathing. The ridge line, poor ass job. They were able to re-install without messing up the panels, but needed to remake the ridge line pieces wider.

Top thing to know was back then (may be different now but doubt it) they don’t use employees for installation, they are all sub-contractors.