Easing_the_Badger

Easing_the_Badger t1_j7mr5i1 wrote

I believe that section of the cycle tracks had steel plates on it during the monument lighting ceremony, so it should be getting close to 90 days, if it's not already past. I'll add a report if it's still terrible the next time I'm there, but could there be an easier system for the DOT to track how long it takes for each section of utility construction?

13