StihlHead460

StihlHead460 t1_ixp8eg8 wrote

OP, your choices are pretty much, install as is, knowing that you don't have an equipment ground and it is a less than ideal situation, refeed the sconces with a wiring method that includes an equipment ground, or just run an equipment ground with you existing wiring (same amount of work as option #2)

1