im4ruckus

im4ruckus t1_j1om9l8 wrote

Can confirm $10k cost for 7.7kW system in AZ. Installed myself and grid tied system has 3 year payback after tax refund. I am carbon neutral and sun shines during day when Heat Pump AC is needed. Wish I had installed when they still had net metering. Now they pay for my power at a lower rate than I pay at night.

1