steventual

steventual OP t1_iwe5qny wrote

Thanks! I am doing a few other places in the house, they all have an existing t molding and will need a reducer, what would be the proper way to do it next time? Should I overhang the Lvt tile over the edge to cover the gap? I was worried that it wouldn’t have support under it and may crack on stepping. Or should I do the same thing, leave the gap and glue to the top Lvt?

1