The town held a discussion with CCRPC last year to discuss connecting the 'bridge to nowhere' segment of the bike path which ends at Beaudry Ln to the sidewalk which ends at Stove and Flag works. They have a design but as Rt 2A is a state road, the number of property owners, and the significant buried and arial utilities in that stretch, they have a lot of red tape to cut through and one shouldn't expect it before 2025 - 2027. One could imagine that the development of the property at the end of Beaudry Ln will complete before then, providing a better connector into the Taft Corners area, sooner.
us3r5436 t1_iy8t05m wrote
Reply to comment by realize-finiteworld in Williston bike path by tacon8
The town held a discussion with CCRPC last year to discuss connecting the 'bridge to nowhere' segment of the bike path which ends at Beaudry Ln to the sidewalk which ends at Stove and Flag works. They have a design but as Rt 2A is a state road, the number of property owners, and the significant buried and arial utilities in that stretch, they have a lot of red tape to cut through and one shouldn't expect it before 2025 - 2027. One could imagine that the development of the property at the end of Beaudry Ln will complete before then, providing a better connector into the Taft Corners area, sooner.
Edit:spelling